# Implementation Plan 0016: Prepare the D&D Deployment Playbook
|
||||
|
||||
Status: ready
|
||||
Status: in_progress
|
||||
|
||||
Target executor: GPT-5.6-Terra
|
||||
|
||||
@@ -50,6 +50,8 @@ deployment and live-acceptance stages. Do not execute them.
|
||||
|
||||
## Stage 1: Finish Consumer Comments and Usage Documentation
|
||||
|
||||
Completion: complete (consumer `7f8353d74efabb5ae408e41be9837df53010dd95`)
|
||||
|
||||
### Objective and Owning Repository
|
||||
|
||||
Make the existing committed consumer configuration self-explanatory in
|
||||
@@ -123,6 +125,8 @@ No deployment or real credential provisioning is required.
|
||||
|
||||
## Stage 2: Record the Repository Preparation Handoff
|
||||
|
||||
Completion: complete (handoff recorded by this change)
|
||||
|
||||
### Objective and Owning Repository
|
||||
|
||||
Record Feature 0016 implementation readiness for independent review in the
|
||||
@@ -167,10 +171,21 @@ required unless separately requested.
|
||||
|
||||
## Progress Notes
|
||||
|
||||
The earlier consumer preparation is committed in `716a80e` and `12b2462`.
|
||||
This revised two-stage plan finishes comments and documentation, then records
|
||||
handoff. Earlier live-deployment stages and their open questions are withdrawn
|
||||
from Feature 0016. No live deployment has been performed.
|
||||
- Consumer `716a80e` added the initial runbook, and `12b2462` committed the
|
||||
minimal playbook, public host choices, and reviewed dependency manifest.
|
||||
Public dependency installation from the mixed manifest succeeded, host
|
||||
listing selected only `pipeline-dnd`, and syntax checking passed.
|
||||
- Stage 1 is complete in consumer commit
|
||||
`7f8353d74efabb5ae408e41be9837df53010dd95`. The plaintext inventory now
|
||||
explains its unresolved Vault references, and the runbook distinguishes the
|
||||
completed repository preparation from future operator installation,
|
||||
credential provisioning, deployment, and application operation.
|
||||
- Stage 1 changed only comments and documentation, so the prior installation,
|
||||
host-listing, and syntax evidence was reused as directed. `git diff --check`
|
||||
passed, and the consumer working tree is clean.
|
||||
- Stage 2 records the implementation handoff for independent review. No live
|
||||
deployment, target validation, credential provisioning, or pipeline session
|
||||
was performed or is claimed by Feature 0016.
|
||||
|
||||
## Open Questions
|
||||
|
||||
|
||||
@@ -4,10 +4,9 @@ Last updated: 2026-09-21
|
||||
|
||||
Current milestone: Operational D&D pipeline deployment
|
||||
|
||||
Current focus: Finish Feature 0016 repository preparation under the revised
|
||||
two-stage plan: comments for unknown host values and concise operator docs,
|
||||
then commit and hand off for review. Controller deployment, target convergence,
|
||||
and session execution are outside this feature; no operational input blocks it.
|
||||
Current focus: Independently review the completed Feature 0016 repository
|
||||
preparation. Controller deployment, target convergence, credential provisioning,
|
||||
and session execution are separate operator work and are not claimed here.
|
||||
Feature 0015 is complete after independent review found no remediation issue.
|
||||
|
||||
| ID | Deliverable | Owner | State | Evidence or next step |
|
||||
@@ -36,7 +35,7 @@ Feature 0015 is complete after independent review found no remediation issue.
|
||||
| F0013 | Publish the first coordinated suite release | all Ansible repositories and workspace | done | Public [`rakestraw.dnd` 0.1.0 release](https://gitea.maximumdirect.net/eric/ansible-collection-dnd/releases/tag/v0.1.0); documentation remediation completed in pipeline `78afffe` and collection `5e695f3` |
|
||||
| F0014 | Enroll existing pipeline operators | ansible-role-dnd-pipeline, ansible-collection-dnd, and workspace | done | Pipeline `c13f726` and collection import `c0b0ebd` passed their complete integration suites and independent review with no remediation findings |
|
||||
| F0015 | Enable D&D S3 storage and publishing | ansible-role-dnd-pipeline, ansible-collection-dnd, and workspace | done | Pipeline `51566afcf69083cdbb5b5718f2544c86b079001c`, collection fixture `cf3de016ee09edf91afc3bc1addfd926d4a172ad`, collection squash `77f67adbc0f700e88bc15554e02052eaa22f1033`, and collection merge `46913446765e86ecfb29ebad9955d579ef6a4c7e` passed the complete repository suites and independent review with no remediation findings |
|
||||
| F0016 | Prepare the D&D deployment playbook for `pipeline-dnd` | rakestraw-ansible and workspace | in_progress | Consumer preparation is in `716a80e` and `12b2462`; revised [plan](roadmap/implementation.md) finishes comments/docs and repository handoff only; previous live-deployment stages withdrawn |
|
||||
| F0016 | Prepare the D&D deployment playbook for `pipeline-dnd` | rakestraw-ansible and workspace | in_progress | Consumer preparation is in `716a80e`, `12b2462`, and `7f8353d`; public dependency installation, target-only host listing, syntax checking, and whitespace validation passed; independent review is next |
|
||||
| A0001 | Audit completed standalone-role test suites | workspace and standalone roles | done | Findings recorded in `docs/roadmap/test-suite-audit-findings.md` |
|
||||
| R0001 | Simplify completed standalone-role test suites | workspace and standalone roles | done | Role commits `e08c63c`, `d2d0b9d`, and `cfecf37` passed implementation and independent review |
|
||||
|
||||
|
||||
Reference in New Issue