# Consolidated Audit Review
Status: review pending; implementation scope has not been selected.
Status: initial scope selected; efficiency and structural-refactoring scope
remain under review. Implementation has not begun.
Consolidated: 2026-10-25. Baseline: `ecd5d5d`.
This document consolidates nine sequential audits for maintainer review. It owns
@@ -18,7 +19,9 @@ are attached to the defects they protect rather than counted as additional
product fixes.
The 35 original numbered findings map to 31 review entries after deduplication
and integration of related test work. All entries remain open and unselected.
and integration of related test work. All findings remain unresolved; the
[settled scope decision](#oq-1-what-should-the-first-implementation-scope-include)
identifies the selected work. OQ-2 and OQ-3 remain open.
Their medium/low priorities retain the original assessments; those labels do not
imply severity certification or implementation order. IDs remain stable as work
is selected or completed.
@@ -99,7 +102,7 @@ of the groups below is for navigation, not an execution sequence.
| B01 and B02 | Panic cleanup must close callback state and the owned host root independently. Neither fix substitutes for the other. |
| C01 and its filesystem tests | Strengthen error/handle assertions while adding failure-phase regressions, using one shared test owner. |
| C02 and C03 | Link expansion correctness is independent of optional glob readability extraction. Do not make the latter a prerequisite. |
| D01, D02, and D03 | Remove confirmed unused copies where selected, then account for the complete retained graph. Removing one unused tree does not fix the remaining omissions. |
| D01, D02, and D03 | Remove the confirmed unused copies, then account for the complete retained graph. Removing one unused tree does not fix the remaining omissions. |
| E01, E02, and E03 | Consider policy-state costs and responsibility boundaries together, but preserve separate scaling and behavioral acceptance cases. |
| F01 and F02 | Removing the test-only acquisition mode does not by itself simplify active lifecycle handoffs. |
| F04, F09, and F12 | Replace useful facade ownership/query coverage before deleting disconnected or representation-coupled scaffolding. |
@@ -879,22 +882,37 @@ not extra fixes.
| deadcode 7 | [F03](#f03-retire-the-parallel-test-only-import-directive-parser) |
| deadcode 8 | [F01](#f01-remove-the-test-only-eager-acquisition-mode), duplicate of complexity 1 |
## Open Questions
## Settled Scope Decisions
### OQ-1. What Should The First Implementation Scope Include?
**Recommendation:** select all nine reported defects with their regression
coverage, plus the bounded cleanup and test improvements where their evidence
holds on the implementation baseline. The unused history copies deserve early
coordination with D01, and callback context/root closure deserve independent
acceptance within the same work area. Keep fixes reviewable and distinct even
when delivered in one sprint.
**Settled:** include all nine reported defects with their regression coverage,
the bounded cleanup, and the identified independent test improvements.
**Alternative:** deliver defect fixes first, then handle cleanup and independent
test improvements in a separate effort. This produces a smaller initial scope
and simpler attribution, but retains known redundant work and can revisit the
same files/tests. Cleanup should not delay a consequential fix merely to achieve
a tidier overall structure.
| Selected work | Finding IDs |
| --- | --- |
| Reported defects and accompanying regression coverage | A01–A04, B01–B02, C01–C02, D01 |
| Removal of unused copies, evidence, helpers, fields, and test-only production paths | D02–D04, F01, F03–F06 |
| Public coverage and stronger or less redundant test assertions | F09–F12 |
This selects 21 review entries. Reconfirm cleanup evidence on the implementation
baseline before removal, and preserve distinct behavioral protection when
replacing tests. Coordinate unused history copies with D01's retained-graph
accounting; verify callback-state closure and host-root closure independently.
Keep fixes and cleanup in focused, reviewable commits, even if delivered in one
sprint. Cleanup must not delay a consequential fix.
The combined scope restores existing contracts and removes demonstrated
maintenance burden while avoiding repeated work at the same ownership and test
boundaries. Delivering defects first and cleanup separately would reduce the
initial review surface, but would retain redundant work and revisit those
boundaries. The combined approach is selected.
The six efficiency candidates and four broader structural refactors remain
unselected pending OQ-2 and OQ-3. This decision does not select new public behavior
or establish an implementation sequence.
## Open Questions
### OQ-2. Which Efficiency Candidates Should Accompany Remediation?
@@ -913,9 +931,10 @@ resource budgets. Broader experiments in `future.md` remain separately deferred.
### OQ-3. How Much Structural Refactoring Should Be Selected?
**Recommendation:** accept F01's removal of the test-only protocol as bounded
cleanup; assess active acquisition handoffs (F02) and policy/evidence ownership
(E03) with their affected fixes before selecting a wider extraction. Leave glob
F01's removal of the test-only protocol is already selected under OQ-1.
**Recommendation:** assess active acquisition handoffs (F02) and policy/evidence
ownership (E03) with their affected fixes before selecting a wider extraction. Leave glob
entry extraction (C03) and transport simplification (F07) optional unless a
concrete design reduces concepts and clarifies ownership.