# Consolidated Audit Review
|
# Consolidated Audit Review
|
||||||
|
|
||||||
Status: initial scope selected; efficiency and structural-refactoring scope
|
Status: initial scope and four localized efficiency improvements selected;
|
||||||
remain under review. Implementation has not begun.
|
collection-policy and structural-refactoring scope remain under review.
|
||||||
|
Implementation has not begun.
|
||||||
Consolidated: 2026-10-25. Baseline: `ecd5d5d`.
|
Consolidated: 2026-10-25. Baseline: `ecd5d5d`.
|
||||||
|
|
||||||
This document consolidates nine sequential audits for maintainer review. It owns
|
This document consolidates nine sequential audits for maintainer review. It owns
|
||||||
@@ -20,8 +21,8 @@ product fixes.
|
|||||||
|
|
||||||
The 35 original numbered findings map to 31 review entries after deduplication
|
The 35 original numbered findings map to 31 review entries after deduplication
|
||||||
and integration of related test work. All findings remain unresolved; the
|
and integration of related test work. All findings remain unresolved; the
|
||||||
[settled scope decision](#oq-1-what-should-the-first-implementation-scope-include)
|
[settled scope decisions](#settled-scope-decisions) identify the 25 selected
|
||||||
identifies the selected work. OQ-2 and OQ-3 remain open.
|
entries. OQ-3 remains open, covering E01/E02 and the four broader refactors.
|
||||||
Their medium/low priorities retain the original assessments; those labels do not
|
Their medium/low priorities retain the original assessments; those labels do not
|
||||||
imply severity certification or implementation order. IDs remain stable as work
|
imply severity certification or implementation order. IDs remain stable as work
|
||||||
is selected or completed.
|
is selected or completed.
|
||||||
@@ -908,38 +909,53 @@ boundaries. Delivering defects first and cleanup separately would reduce the
|
|||||||
initial review surface, but would retain redundant work and revisit those
|
initial review surface, but would retain redundant work and revisit those
|
||||||
boundaries. The combined approach is selected.
|
boundaries. The combined approach is selected.
|
||||||
|
|
||||||
The six efficiency candidates and four broader structural refactors remain
|
Efficiency and broader structural choices are addressed separately below. This
|
||||||
unselected pending OQ-2 and OQ-3. This decision does not select new public behavior
|
decision does not select new public behavior or establish an implementation
|
||||||
or establish an implementation sequence.
|
sequence.
|
||||||
|
|
||||||
## Open Questions
|
|
||||||
|
|
||||||
### OQ-2. Which Efficiency Candidates Should Accompany Remediation?
|
### OQ-2. Which Efficiency Candidates Should Accompany Remediation?
|
||||||
|
|
||||||
**Recommendation:** consider E04/E05 as narrow local improvements, and A05/F08
|
**Settled:** include the four localized efficiency improvements below. Decide
|
||||||
as lower-priority options after their correctness/diagnostic boundaries are sound.
|
E01/E02 together with collection-policy preparation and evidence ownership (E03)
|
||||||
Evaluate E01/E02 together with E03 before committing to a policy-state redesign:
|
under OQ-3; those two efficiency candidates remain unselected.
|
||||||
their distinct scaling cases need preserved acceptance even if they share an
|
|
||||||
implementation. These candidates have source-level evidence of avoidable work,
|
|
||||||
but no new measured speedup claim.
|
|
||||||
|
|
||||||
**Alternative:** defer all six efficiency candidates until representative consumer
|
| Selected improvement | Scope and dependency |
|
||||||
profiling establishes their practical cost. This concentrates the first effort
|
| --- | --- |
|
||||||
on correctness and cleanup, at the cost of retaining demonstrated growth patterns.
|
| E04: tier-history projection lookups | Reuse a local lookup index or equivalent traversal while preserving authored coordinates and projection evidence. |
|
||||||
It does not block C02's availability fix or A04/D01's enforcement of existing
|
| E05: compound identity restoration | Avoid repeated mapping scans while preserving child identity, mapping order, and detached nodes. |
|
||||||
resource budgets. Broader experiments in `future.md` remain separately deferred.
|
| A05: dynamic-type eligibility reuse | Reuse only completed successful checks within the operation, after A02 repairs descriptor construction failure state. |
|
||||||
|
| F08: secret-failure location lookup | Include at lower priority; prepare lookup state lazily so successful loads avoid unnecessary indexing. |
|
||||||
|
|
||||||
|
Together with OQ-1, this selects 25 review entries. These local changes address
|
||||||
|
source-demonstrated repeated work without requiring public APIs, persistent
|
||||||
|
caches, or a new architectural model. Preserve their behavioral acceptance
|
||||||
|
cases and keep implementation proportionate. E01/E02 involve policy retirement
|
||||||
|
timing and mutable ownership, so their scope belongs with the E03 discussion.
|
||||||
|
|
||||||
|
Deferring all six until consumer profiling was considered. That would reduce
|
||||||
|
initial scope and avoid optimizing uncommon workloads, but would retain known
|
||||||
|
growth patterns with relatively direct remedies in the four selected cases.
|
||||||
|
The selected approach does not promise a measured startup improvement; practical
|
||||||
|
benefit depends on configuration shape and workload. Broader experiments in
|
||||||
|
[future.md](future.md#3-performance-experiments) remain deferred. C02's availability
|
||||||
|
fix and A04/D01's existing-budget enforcement remain selected independently.
|
||||||
|
|
||||||
|
## Open Questions
|
||||||
|
|
||||||
### OQ-3. How Much Structural Refactoring Should Be Selected?
|
### OQ-3. How Much Structural Refactoring Should Be Selected?
|
||||||
|
|
||||||
F01's removal of the test-only protocol is already selected under OQ-1.
|
F01's removal of the test-only protocol is already selected under OQ-1.
|
||||||
|
OQ-2 leaves E01/E02's policy retirement and copying improvements for this decision,
|
||||||
|
alongside E03's policy preparation and evidence responsibilities. Their distinct
|
||||||
|
scaling cases must remain visible even if implemented together.
|
||||||
|
|
||||||
**Recommendation:** assess active acquisition handoffs (F02) and policy/evidence
|
**Recommendation:** assess active acquisition handoffs (F02) and policy/evidence
|
||||||
ownership (E03) with their affected fixes before selecting a wider extraction. Leave glob
|
ownership (E03), including E01/E02, with their affected fixes before selecting a
|
||||||
entry extraction (C03) and transport simplification (F07) optional unless a
|
wider extraction. Leave glob entry extraction (C03) and transport simplification
|
||||||
concrete design reduces concepts and clarifies ownership.
|
(F07) optional unless a concrete design reduces concepts and clarifies ownership.
|
||||||
|
|
||||||
**Alternative:** include all four structural refactors in the same effort for a
|
**Alternative:** include all four structural refactors alongside E01/E02 in the
|
||||||
more uniform maintenance result. This offers broader readability improvements
|
same effort for a more uniform maintenance result. This offers broader readability improvements
|
||||||
but increases review scope and the chance of moving complexity rather than
|
but increases review scope and the chance of moving complexity rather than
|
||||||
removing it. Neither approach calls for a new public API, generic framework, or
|
removing it. Neither approach calls for a new public API, generic framework, or
|
||||||
changes to the established configuration model.
|
changes to the established configuration model.
|
||||||
|
|||||||