Complete documentation compliance follow-up

This commit is contained in:
2026-07-26 17:46:01 +00:00
parent 719243e90c
commit a0e905ce46
2 changed files with 15 additions and 9 deletions

View File

@@ -2,11 +2,9 @@
## Status ## Status
The initial documentation refresh was completed on 2026-07-26. A The initial documentation refresh and its follow-up compliance work were
post-completion review identified a small set of contract, test-maintainability, completed on 2026-07-26. The documentation prerequisite for Step 2 of the
and roadmap-status issues. The ordered follow-up stages below are pending and [Promptkit migration roadmap](migration.md) is satisfied.
should be completed before beginning Step 2 of the
[Promptkit migration roadmap](migration.md).
## Objective ## Objective
@@ -133,3 +131,11 @@ This follow-up is complete when:
- roadmap status accurately distinguishes completed and pending migration work; - roadmap status accurately distinguishes completed and pending migration work;
and and
- links, examples, tests, vet, and build validation pass. - links, examples, tests, vet, and build validation pass.
## Completion Record
Completed on 2026-07-26. The timeout contract, single-file source contract,
strict-decoding boundary, and maintained HTTP example check were reconciled.
Final validation confirmed local links and paths, both maintained configuration
files through the real loader, the maintained render and Go package examples,
`go test ./...`, `go vet ./...`, and `go build ./cmd/scriptorium`.

View File

@@ -2,8 +2,8 @@
## Status ## Status
Accepted plan. This document describes proposed work that is not yet Accepted plan. Step 1, the documentation refresh, is complete. Steps 2 through
implemented. 9 remain proposed and are not yet implemented.
## Objective ## Objective
@@ -94,8 +94,8 @@ refresh and policy updates are merged and the repository has an agreed,
accurate baseline. accurate baseline.
**Gate status:** Complete as of 2026-07-26. The completed documentation **Gate status:** Complete as of 2026-07-26. The completed documentation
refresh and its verification record are in the refresh and follow-up verification record are in the [documentation compliance
[documentation compliance roadmap](documentation.md). roadmap](documentation.md).
### Step 2: Record The Architectural Decision And Detailed Boundary ### Step 2: Record The Architectural Decision And Detailed Boundary