Document profile and prompt identity listings

This commit is contained in:
2026-10-09 04:34:45 +00:00
parent f2aeb5eb30
commit 301192b974
10 changed files with 77 additions and 22 deletions

View File

@@ -2,7 +2,7 @@
Implement the [listing roadmap](listing.md) in the numbered order below.
Each stage is scoped for one Luna coding-agent prompt and should leave a
compiling, tested unit. All four stages are pending.
compiling, tested unit. All four stages are complete.
This replaces the completed performance plan, preserved in
[Git history](https://gitea.maximumdirect.net/eric/promptkit/src/commit/7325a34c070c77c4784ab76c916fc8a4d79b5c46/docs/roadmap/implementation.md).
@@ -216,7 +216,11 @@ independent results, concurrent safety, and listing without execution work.
## Stage 4 — Document And Verify The Completed Feature
**Status: Pending.** Depends on Stage 3.
**Status: Complete (2026-10-09).** Verified with the full offline race suite,
repository-wide vet, maintained consumer examples, changed documentation-link
checks, and `git diff --check`. The listing roadmap and canonical consumer,
format, and internal documentation now describe the implemented API. Depends
on Stage 3.
**Scope:** owning documentation, final review, and complete offline verification.

View File

@@ -1,7 +1,7 @@
# Effective Prompt Requirement Inspection
Status: Implemented (2026-10-08). The
[implementation plan](implementation.md) records the completed work units and
[inspection implementation plan](https://gitea.maximumdirect.net/eric/promptkit/src/commit/481e2d494c5a4e8b7f3a2a6f1cceaeb3f7c71d05/docs/roadmap/implementation.md) records the completed work units and
final verification. Current public API details live in GoDoc; the consumer
guide, format reference, and internal documents link to those canonical
contracts.
@@ -194,7 +194,7 @@ template syntax and effective metadata; inspection does not enter artifact,
schema, credential, rendering, provider, or execution preparation.
The final verification and the commit sequence are recorded in the
[implementation plan](implementation.md). The exact public contract is owned by
[inspection implementation plan](https://gitea.maximumdirect.net/eric/promptkit/src/commit/481e2d494c5a4e8b7f3a2a6f1cceaeb3f7c71d05/docs/roadmap/implementation.md). The exact public contract is owned by
[GoDoc](../../requirements.go); consumer usage, framework-format cross-reference,
and internal selection/source descriptions are maintained in their respective
documents.

View File

@@ -1,6 +1,8 @@
# Profile And Prompt Listing
Status: Accepted; implementation pending.
Status: Implemented (2026-10-09). All public listing behavior and verification
are complete; see the [implementation plan](implementation.md) for completion
and verification evidence.
## Purpose
@@ -10,8 +12,8 @@ history. This supports application selectors, CLI discovery, and configuration
editors while keeping PromptKit's public API small.
Listing supplies identities; the existing inspection methods supply details.
The [implementation plan](implementation.md) defines staged work. This roadmap
describes the intended feature, not currently available methods.
The [implementation plan](implementation.md) records the completed work. This
roadmap captures feature scope; the public GoDoc owns the current API behavior.
## Current Baseline

View File

@@ -3,7 +3,7 @@
Status: Complete (2026-10-09). The ConfigKit request (item 1) was submitted,
and local items 2–7 were implemented or completed with the evidence and
conditional ownership decision recorded in the
[implementation plan](implementation.md). No dependency upgrade or public
[performance implementation plan](https://gitea.maximumdirect.net/eric/promptkit/src/commit/7325a34c070c77c4784ab76c916fc8a4d79b5c46/docs/roadmap/implementation.md). No dependency upgrade or public
performance guarantee was part of this work.
## Purpose
@@ -14,7 +14,7 @@ library use make redundant full-payload copies especially worth addressing.
Prefer small, idiomatic improvements over additional framework machinery.
This roadmap captures the intended outcomes and recommended changes. The
[implementation plan](implementation.md) owns staged work and verification.
[performance implementation plan](https://gitea.maximumdirect.net/eric/promptkit/src/commit/7325a34c070c77c4784ab76c916fc8a4d79b5c46/docs/roadmap/implementation.md) owns staged work and verification.
This roadmap introduces no new public performance guarantee. Existing contracts
remain owned by GoDoc, the
[format reference](../formats.md), and the

View File

@@ -5,7 +5,7 @@ Status: All recorded findings have been resolved in separate remediation units.
## Computational Efficiency Review
Review baseline: `8a5c0de`, compared with planning commit `3fde1f6`, the
[performance roadmap](performance.md), and [implementation plan](implementation.md).
[performance roadmap](performance.md), and [performance implementation plan](https://gitea.maximumdirect.net/eric/promptkit/src/commit/7325a34c070c77c4784ab76c916fc8a4d79b5c46/docs/roadmap/implementation.md).
### Finding 1 — Release A Stale File Reservation For An Empty Body (P3)
@@ -59,7 +59,7 @@ gaps or strengthened public contracts were identified in this review.
Review baseline: `a051edd82d9d20cdc82dfebf25adb689dc58b01f`.
Scope: implementation commits after `a6e0ffe`, compared with the simplified
[feature roadmap](inspection.md) and [implementation plan](implementation.md).
[feature roadmap](inspection.md) and [inspection implementation plan](https://gitea.maximumdirect.net/eric/promptkit/src/commit/481e2d494c5a4e8b7f3a2a6f1cceaeb3f7c71d05/docs/roadmap/implementation.md).
The existing ReleaseKit documentation finding is retained below.
### Finding 1 — Report Lost Caller-Map Scope As Incomplete (P2)