# ConfigKit And PromptKit Upgrade Implementation Plan
|
# Policy Alignment Implementation Plan
|
||||||
|
|
||||||
## Purpose And Scope
|
## Purpose And Execution Contract
|
||||||
|
|
||||||
Implement [ConfigKit And PromptKit Upgrades](upgrade-kit.md). That document
|
Implement [Standard Repository Policy Alignment](policy.md). That feature
|
||||||
owns the desired behavior and operator migration; this document owns execution
|
roadmap owns the target policy choices and justified Notarius exceptions; this
|
||||||
order. Each numbered stage is one bounded implementation prompt for a
|
document owns implementation order. It replaces the completed kit-upgrade plan,
|
||||||
gpt-5.6-terra coding agent. Complete and validate stages in order.
|
not the implementation or contracts delivered by that earlier work.
|
||||||
|
|
||||||
The inspected baseline pins ConfigKit v0.3.0 and PromptKit v0.10.0. Adopt
|
Each numbered stage is one bounded prompt for a gpt-5.6-terra coding agent.
|
||||||
exactly ConfigKit v0.4.0 and PromptKit v0.11.0, not whatever release happens to
|
Complete stages in order. Inspect the worktree before each stage, preserve
|
||||||
be newest during implementation. The release guides and public APIs are
|
unrelated work, validate the resulting documentation, and commit the coherent
|
||||||
available in the sibling checkouts `../ConfigKit` and `../promptkit`; consult
|
stage under agent policy. Report changed files, checks, and any concrete blocker.
|
||||||
the target tags or downloaded modules if those checkouts have advanced.
|
Do not push, tag, publish, or retire unrelated roadmaps.
|
||||||
Build and test Notarius with `GOWORK=off`, without local dependency replacements.
|
|
||||||
|
|
||||||
Read `docs/development.md` and all five policies in `docs/policy/` before
|
This is a documentation/policy migration. Do not change application code,
|
||||||
implementation. In particular, simplify machinery without narrowing operator
|
dependency pins, tests, release scripts, runtime contracts, or release gates.
|
||||||
choices or elevating incidental details into requirements. Preserve existing
|
No production credentials or model calls are needed.
|
||||||
contracts unless this roadmap expressly changes them. Use graph discovery for
|
|
||||||
code, then inspect the relevant source and tests; locations below identify the
|
|
||||||
reviewed baseline, not a requirement to preserve private file structure.
|
|
||||||
|
|
||||||
## Decisions And Boundaries
|
## Fixed Sources And Adoption Rules
|
||||||
|
|
||||||
- Configuration selection becomes `--config-overlay` and `overlays/<name>.yml`,
|
Use upstream full commit
|
||||||
with no legacy alias or fallback. Keep empty, omitted, and `default` selection
|
`d84a38ebab26f048cafbe59a2246700c35d29843` throughout.
|
||||||
behavior. Do not rename PromptKit profiles or pipeline/runtime profile types.
|
Begin with its
|
||||||
- Keep configuration version 5, source-file-relative declarations, CLI override
|
[adoption guide](https://gitea.maximumdirect.net/eric/policy/src/commit/d84a38ebab26f048cafbe59a2246700c35d29843/docs/adoption.md).
|
||||||
precedence, strict loading, inspection provenance, and redaction.
|
Read applicable local policies through `docs/development.md`; when revising a
|
||||||
- Add only the global `promptkit.transient_retries` setting: nonnegative integer,
|
policy, also read the upstream counterpart and affected cross-policy provisions.
|
||||||
default **2 additional attempts**, explicit zero disables. No arbitrary cap,
|
Do not reconstruct historical adoption baselines.
|
||||||
per-binding setting, new CLI retry flag, or new total-deadline setting.
|
|
||||||
- PromptKit owns transient HTTP retries and structural repairs; Notarius keeps
|
|
||||||
stage/validator retry budgets and disposition unchanged. The existing shared
|
|
||||||
scheduler retains its completion-scoped permit through upstream waiting.
|
|
||||||
- Add provider-neutral failure metadata and request-local execution summaries.
|
|
||||||
Do not change domain artifacts, result receipts, prompt content, validators,
|
|
||||||
acceptance policy, or introduce a new telemetry service/artifact.
|
|
||||||
- Successful retry recovery is ordinary success, not a warning. Debug remains
|
|
||||||
opt-in. Existing token fields keep their meaning; observed usage is separate.
|
|
||||||
- No release, tag, push, source-license change, or binary packaging is part of
|
|
||||||
these stages. Record upgrade implications in current integration/operator
|
|
||||||
documentation; the eventual release note is a separate release task.
|
|
||||||
|
|
||||||
For each stage, inspect the starting worktree, implement code with its focused
|
Retrieve pinned files through public URLs or `git show` against that exact
|
||||||
tests and current-behavior documentation, run the listed relevant checks, and
|
commit in an available checkout. Do not use an unverified sibling working tree
|
||||||
make one coherent local commit under agent policy. Report checks and any gaps.
|
or silently select newer upstream content. An unavailable source is a concrete
|
||||||
Do not repeat passed checks for unchanged content merely to make a commit.
|
blocker to copying it accurately, not a reason to invent its text.
|
||||||
|
|
||||||
## Stage 1 — Cut Over Configuration Selection To Overlays
|
For every adopted policy:
|
||||||
|
|
||||||
**Status:** Completed 2026-09-25.
|
- Copy upstream wording verbatim except for required template removal and the
|
||||||
|
agreed, substantive project-specific customizations in the feature roadmap.
|
||||||
|
- Retain its upstream Base Policy Version; set Last Updated to the actual date
|
||||||
|
the local document is adopted, not the review date by habit.
|
||||||
|
- Add Upstream Source pointing to its own file at the full selected commit:
|
||||||
|
`https://gitea.maximumdirect.net/eric/policy/src/commit/d84a38ebab26f048cafbe59a2246700c35d29843/docs/policy/FILE.md`.
|
||||||
|
- Remove the entire Base Policy Template section and perform its instructions.
|
||||||
|
Keep upstream generic rules outside it, including commit-pinned example links.
|
||||||
|
- Explain substantive local exceptions briefly where they apply, or retain an
|
||||||
|
existing rationale/ADR link. Do not create an exception registry or preserve
|
||||||
|
stylistic paraphrases merely because they already exist.
|
||||||
|
|
||||||
**Goal:** Adopt ConfigKit v0.4.0 and finish its narrow operator-facing rename in
|
Current public project and adoption-guide links are discovery links; they may
|
||||||
one coherent change. This is one prompt: it is a naming migration, not a new
|
follow main. Source, example, and attribution links stay commit-pinned. Preserve
|
||||||
configuration engine.
|
accurate preexisting example pins supplied by the selected OSS template.
|
||||||
|
Metadata must reflect only documents actually adopted by the current stage.
|
||||||
|
The transition may temporarily contain mixed versions without claiming otherwise.
|
||||||
|
|
||||||
**Inspect:** `internal/core/config/load.go`, `loaded_config.go`, configuration
|
## Stage 1 — Establish Provenance And Copied-Policy Licensing
|
||||||
document/path/operational tests; `internal/cli/run.go`,
|
|
||||||
`configkit_commands.go`, CLI configuration and example contract tests;
|
|
||||||
`examples/profiles/development.yml`; upstream v0.4.0 migration guide.
|
|
||||||
|
|
||||||
**Work:**
|
**Goal:** Establish the self-contained adoption and licensing foundation.
|
||||||
|
One prompt limited to two short policies and their actual notice materials.
|
||||||
|
|
||||||
1. Upgrade ConfigKit to v0.4.0 in `go.mod`/`go.sum`. Change `LoadOptions.Profile`
|
**Read:** Selected upstream `docs/policy/meta.md` (1.0),
|
||||||
to `Overlay` and pass it into `configkit.Options[Document].Overlay`. Rename
|
`docs/policy/oss.md` (1.8), `COPYRIGHT`,
|
||||||
only helpers, fields, locals, fixtures, and descriptions representing the
|
`examples/licensing/policy-attribution.md`, and the adoption guide;
|
||||||
selected configuration layer.
|
local `COPYRIGHT`, `LICENSE`, and the feature roadmap.
|
||||||
2. Replace `--config-profile` with `--config-overlay` for `run`, `config validate`,
|
|
||||||
`config effective`, `config explain`, and `pipelines list`. Update usage,
|
|
||||||
flag parsing, argument classification, explicit-empty handling, and error
|
|
||||||
paths together. Retired flags use normal unknown-flag behavior.
|
|
||||||
3. Move `examples/profiles/development.yml` to
|
|
||||||
`examples/overlays/development.yml`; update maintained-example discovery and
|
|
||||||
selected-layer fixtures. Check file-relative paths after moving. Leave
|
|
||||||
`examples/llm-profiles/`, PromptKit profile sources, and ordinary explicit
|
|
||||||
imports alone unless an import actually points at the moved example.
|
|
||||||
4. Consume upstream overlay provenance and diagnostic names directly. Do not
|
|
||||||
rebuild composition, implement directory fallback, or translate metadata
|
|
||||||
back to profile vocabulary.
|
|
||||||
5. Update `docs/config.md`, `docs/cli.md`, `docs/integrations/pkg-configkit.md`,
|
|
||||||
`docs/internal/configuration.md`, relevant portions of `docs/internal/cli.md`,
|
|
||||||
and `docs/consumers/subprocess.md`. Review README, operations, and other
|
|
||||||
consumer examples for affected invocations. Explain the clean migration and
|
|
||||||
distinction from LLM profiles. Preserve accepted ADR-0018 and release history.
|
|
||||||
|
|
||||||
**Acceptance:** All five commands select overlays consistently. Representative
|
**Files:** Create `docs/policy/meta.md`, `docs/policy/oss.md`,
|
||||||
existing tests cover selected/base/empty/default behavior, overlay and explicit
|
`docs/oss/attribution.md`, and
|
||||||
override precedence, declaration-relative paths, redacted effective/explain
|
`docs/oss/licenses/CC-BY-SA-4.0.txt`; update `COPYRIGHT`.
|
||||||
output, and source-aware failure labels. Include a selected legacy-only file
|
|
||||||
case proving there is no silent fallback. Retain ordinary-import behavior and
|
|
||||||
LLM profile coverage; do not duplicate every upstream parser case.
|
|
||||||
|
|
||||||
**Validate:** `GOWORK=off go test ./internal/core/config ./internal/cli`,
|
1. Adopt meta and OSS using the fixed-source rules. Keep public discovery URLs
|
||||||
`GOWORK=off go mod tidy -diff`, `git diff --check`. Review occurrences of
|
in meta and link to the existing local developer guide and new attribution.
|
||||||
`config-profile` and `examples/profiles` in current docs/code semantically;
|
Point project-specific OSS context to Notarius's grant and release runbook;
|
||||||
historical docs and explicit legacy-rejection tests are not defects.
|
do not import generic example projects.
|
||||||
|
2. Create attribution with `# Open Source Attribution Notices` followed by
|
||||||
|
the canonical policy entry. Replace all three UPSTREAM_COMMIT placeholders.
|
||||||
|
Initially identify the two newly adopted policy files as adapted material.
|
||||||
|
Later stages expand this statement as their material is actually adopted;
|
||||||
|
do not imply that the older five files have already been refreshed.
|
||||||
|
3. Copy the complete CC BY-SA 4.0 standard text from the pinned reference asset.
|
||||||
|
Preserve the canonical copyright/SPDX/notices/source arrangement and its
|
||||||
|
modification indication. Do not add research or compliance prose.
|
||||||
|
4. Add a distinct scope statement to COPYRIGHT: policy material adapted from
|
||||||
|
Standard Repository Policies remains CC-BY-SA-4.0, with attribution defining
|
||||||
|
the affected material. Keep the existing GPL-3.0-or-later application grant,
|
||||||
|
warranty disclaimer, and third-party statement; leave root LICENSE unchanged.
|
||||||
|
5. Do not create placeholder dependency entries. Dependency inventory is assigned
|
||||||
|
to Stages 4–5, and remains tracked here rather than asserted complete.
|
||||||
|
|
||||||
## Stage 2 — Upgrade The PromptKit Runtime Baseline
|
**Acceptance:** Both policies have correct versions, date, file-specific source
|
||||||
|
links, and no template-only section. All new relative links resolve. Attribution
|
||||||
|
describes this stage's actual material, and code licensing is unchanged.
|
||||||
|
|
||||||
**Status:** Completed 2026-09-25.
|
**Validation:** Compare copied policy bodies and license text to the pinned
|
||||||
|
sources; inspect deliberate substitutions. Run `git diff --check` and review
|
||||||
|
the COPYRIGHT diff. No Go tests are needed.
|
||||||
|
|
||||||
**Goal:** Adopt the compatible upstream dependency and document its changed
|
## Stage 2 — Standardize General Policies And Selective Orientation
|
||||||
default before adding Notarius controls. One small prompt.
|
|
||||||
|
|
||||||
**Inspect:** `internal/framework/llm/promptkit_client.go`, asset/profile identity
|
**Goal:** Adopt the general rules and their reading workflow. One prompt:
|
||||||
helpers and tests, `go.mod`, and upstream v0.11.0 release/consumer documentation.
|
three largely verbatim policy updates plus small orientation edits.
|
||||||
|
|
||||||
**Work:**
|
**Read:** Local agent/testing/documentation policies; pinned upstream versions
|
||||||
|
1.3, 1.3, and 1.11 respectively; upstream `agents/AGENTS.md` and the adoption
|
||||||
|
guide's Policy Reading Guide; local `AGENTS.md` and `docs/development.md`.
|
||||||
|
|
||||||
1. Pin PromptKit v0.11.0 and tidy. Keep the Go version and provider catalog
|
**Files:** Update `docs/policy/agents.md`, `testing.md`,
|
||||||
selections unless the actual dependency graph requires a change; the target
|
`documentation.md`, root `AGENTS.md`, `docs/development.md`, and
|
||||||
release does not require either. Do not alter embedded D&D model settings.
|
`docs/oss/attribution.md`.
|
||||||
2. Update `promptKitBuiltinProfileCatalogID` to the v0.11.0 identity in accordance
|
|
||||||
with the existing checkpoint fingerprint convention. No other cache policy
|
|
||||||
change or blanket invalidation is part of this work.
|
|
||||||
3. Update the pinned integration links in `docs/integrations/pkg-promptkit.md`,
|
|
||||||
including the relocated upstream `docs/policy/release.md`. Record the
|
|
||||||
LGPL-3.0-or-later dependency license and reference its license/notices; do not
|
|
||||||
relicense Notarius or invent a new distribution workflow.
|
|
||||||
4. Remove the obsolete no-provider-retry-loop statement in `docs/internal/llm.md`.
|
|
||||||
Describe the now-active upstream default and per-attempt timeouts in the
|
|
||||||
appropriate integration/operations sections. Do not yet describe the setting
|
|
||||||
or observations from later stages as implemented.
|
|
||||||
|
|
||||||
**Acceptance:** The prepared-execution adapter builds and its existing tests
|
1. Adopt agent and testing substantive wording without local paraphrases.
|
||||||
pass without prompt/catalog changes. Current documentation acknowledges the
|
Remove the redundant agent preamble, additional generic contract-preservation
|
||||||
dependency's default retry behavior and license accurately.
|
prose, and ADR-0017 illustration. Its decision remains in architecture/ADR;
|
||||||
|
this is not permission to change it.
|
||||||
|
2. Adopt documentation wording and ownership rows. Customize the consumer row
|
||||||
|
for existing subprocess guidance, not a hypothetical public Go API.
|
||||||
|
Omit the inapplicable HTTP contract row; preserve applicable CLI/config/
|
||||||
|
operations/integration/internal ownership. Remove the local duplicate
|
||||||
|
implementation-details-versus-policy section.
|
||||||
|
3. Base root AGENTS.md on upstream `agents/AGENTS.md`, not upstream root
|
||||||
|
AGENTS.md. Preserve applicable existing instructions. Require orientation
|
||||||
|
through the developer guide and agent policy, but not full-suite reading.
|
||||||
|
4. Add the adoption guide's seven-row selective Policy Reading Guide and its
|
||||||
|
selection/reuse/scope-expansion rules to docs/development.md. Retain existing
|
||||||
|
subsystem navigation and validation guidance; remove redundant competing
|
||||||
|
policy-trigger rows from the old table rather than creating two authorities.
|
||||||
|
5. Expand the attribution material statement to identify the newly refreshed
|
||||||
|
policy files, adapted AGENTS.md, and copied policy-reading-guide portion of
|
||||||
|
docs/development.md. Do not license the unrelated remainder as copied policy.
|
||||||
|
Ensure the COPYRIGHT scope statement covers these identified portions.
|
||||||
|
|
||||||
**Validate:** `GOWORK=off go test ./internal/framework/llm ./internal/cli`,
|
**Acceptance:** General rules match upstream, except required documentation
|
||||||
`GOWORK=off go mod tidy -diff`, `git diff --check`.
|
ownership customization. All seven policy triggers are available; existing
|
||||||
|
subsystem links still work. Reading is selective and public discovery is reachable.
|
||||||
|
No test changes or stricter testing/commit requirements were introduced.
|
||||||
|
|
||||||
## Stage 3 — Wire The Explicit Transient Retry Setting
|
**Validation:** Diff each policy against its pinned source, inspect AGENTS and
|
||||||
|
developer-guide navigation, check attribution scope and relative links, and run
|
||||||
|
`git diff --check`. Search affected files for leftover template instructions.
|
||||||
|
|
||||||
**Status:** Completed 2026-09-25.
|
## Stage 3 — Align Architecture And Release Policies Without Contract Changes
|
||||||
|
|
||||||
**Goal:** Make retry policy inspectable and configurable through the one shared
|
**Goal:** Complete the customized policies and release navigation. One prompt
|
||||||
engine. One prompt covering a single vertical configuration slice.
|
focused on preserving existing decisions rather than redesigning them.
|
||||||
|
|
||||||
**Inspect:** `internal/core/config/{document,config,load,operational_document,
|
**Read:** Local architecture and release policies, docs/release.md, relevant
|
||||||
loaded_config,validation}.go`, effective-config tests;
|
linked ADRs; pinned upstream architecture 1.3 and release 1.4. Use
|
||||||
`internal/cli/catalog.go:buildProductionLLMClient`;
|
docs/internal/overview.md and existing canonical contracts only where needed to
|
||||||
`internal/framework/llm/promptkit_client.go:NewPromptKitClient` and HTTP tests.
|
resolve an ownership question.
|
||||||
|
|
||||||
**Work:**
|
**Files:** Update `docs/policy/architecture.md`, `docs/policy/release.md`,
|
||||||
|
`docs/release.md`, and `docs/oss/attribution.md`.
|
||||||
|
|
||||||
1. Add `TransientRetries *int` to `PromptKitDocument` and a resolved integer to
|
1. Adopt upstream general architecture ownership/approach guidance. Replace its
|
||||||
`PromptKitConfig`. Supply 2 through both the document default path and the
|
application-specific template guidance with Notarius's existing decisions.
|
||||||
runtime `Default()` path. Preserve explicit zero; never use zero as omission.
|
Preserve the feature roadmap's enumerated pipeline, module, assets, domain,
|
||||||
Include it in document-to-runtime conversion and effective configuration.
|
identity, validation/retry, scheduling, configuration/provenance, state,
|
||||||
2. Reject negative values through both existing document and direct runtime
|
secret-handling, permissions, platform, and distribution contracts.
|
||||||
validation entry points. Follow current source-aware diagnostics; do not
|
Keep existing application-specific sections unless an edit is necessary for
|
||||||
impose a new maximum. Keep ConfigKit's existing decoding behavior.
|
the adopted structure; do not turn this into a broad architecture rewrite.
|
||||||
3. Add `TransientRetries *int` to `PromptKitClientConfig`: nil follows upstream
|
2. Adopt release wording with narrow project customizations: source only,
|
||||||
default, non-nil includes explicit zero. Production construction always
|
lightweight tags, main/origin, branch-before-tag, no prereleases, and no
|
||||||
supplies the resolved configuration value. Pass it into `promptkit.Config`,
|
hosted/asynchronous deliverables. Keep the native CLI/version check and
|
||||||
not per-request options. All calls through the injected shared client thus
|
GOWORK=off rationale. Preserve the historical no-retrospective-notes decision.
|
||||||
share the setting without module changes.
|
Retain unchanged generic requirements verbatim.
|
||||||
4. Add the setting to `examples/dnd-complete.config.yml` and `docs/config.md`;
|
3. Add the OSS footer rule for new notes. Update the runbook with a copyable
|
||||||
keep the minimal example minimal. Update configuration/LLM internal guides
|
three-link COPYRIGHT | LICENSE | ATTRIBUTION footer using absolute
|
||||||
for the new plumbing and operations for the zero-value opt-out.
|
`https://gitea.maximumdirect.net/eric/notarius/src/tag/<version>/...` paths.
|
||||||
|
Explain substitution of the selected release tag and local path checking.
|
||||||
|
Do not require a future tag to resolve or change publication scripts.
|
||||||
|
4. Expand policy attribution to the complete adopted docs/policy set, retaining
|
||||||
|
the AGENTS/developer-guide scope from Stage 2 and any relevant adaptation
|
||||||
|
indications. All seven per-document source links now identify this adoption.
|
||||||
|
|
||||||
**Acceptance/tests:** Demonstrate omitted default, explicit zero, a positive
|
**Acceptance:** Existing architecture and release choices are unchanged and their
|
||||||
override, negative rejection, and effective/explain inspection. Use an existing
|
local reasons remain clear. Upstream generic wording is used where applicable.
|
||||||
CLI factory test to prove the resolved value reaches construction. Exercise
|
There are no new gates, platforms, artifacts, retrospective notes, or ADR edits.
|
||||||
built-in generation with a local HTTP server: eligible failure then success,
|
|
||||||
disabled retries, exhausted configured count, and a noneligible 400 response.
|
|
||||||
An injected `LLMClient` stub does not test built-in HTTP retry wiring. Avoid
|
|
||||||
testing the upstream jitter formula or every equivalent HTTP status.
|
|
||||||
|
|
||||||
**Validate:** `GOWORK=off go test ./internal/core/config ./internal/cli ./internal/framework/llm`
|
**Validation:** Review policy diffs specifically for added/removed requirements,
|
||||||
and `git diff --check`.
|
check runbook agreement and affected links, and run `git diff --check`.
|
||||||
|
Do not run a release/publication command. No runtime tests are warranted.
|
||||||
|
|
||||||
## Stage 4 — Preserve Typed Failure And Exhaustion Metadata
|
## Stage 4 — Attribute The Kit Dependencies And Catalogs
|
||||||
|
|
||||||
**Status:** Completed 2026-09-25.
|
**Goal:** Add the first bounded group of component notices: ConfigKit,
|
||||||
|
PromptKit, and their two backend catalogs. One prompt for four related projects.
|
||||||
|
|
||||||
**Goal:** Distinguish provider failures without coupling callers to PromptKit.
|
**Read:** Adopted OSS policy; go.mod/go.sum, resolved build dependency metadata;
|
||||||
One prompt; defer execution observations to the next stage.
|
exact selected module COPYRIGHT/LICENSE/NOTICE/attribution files and VCS metadata.
|
||||||
|
The reviewed pins are ConfigKit v0.4.1, PromptKit v0.11.1, and both catalog
|
||||||
|
modules v2.20260926.0; verify the actual selected versions before writing.
|
||||||
|
|
||||||
**Inspect:** `internal/framework/contracts/errors.go`, adapter error conversion
|
**Files:** Update `docs/oss/attribution.md`; add applicable texts under
|
||||||
in `promptkit_client.go`, redaction helpers, and existing pipeline handling of
|
`docs/oss/licenses/`.
|
||||||
`ErrLLMGeneration`, `ErrLLMCapacityExceeded`, and invalid structured output.
|
|
||||||
|
|
||||||
**Work:**
|
1. Use read-only discovery such as `GOWORK=off go list -m -json all`,
|
||||||
|
`GOWORK=off go list -deps ./cmd/notarius`, and selected module contents.
|
||||||
|
Dependency acquisition may populate the module cache but must not change
|
||||||
|
dependency pins or introduce a local replace directive.
|
||||||
|
2. Establish each selected version's exact source commit from module/VCS
|
||||||
|
metadata; peel annotated tags to commits. Do not substitute a tag object ID,
|
||||||
|
main-branch head, assumed sibling HEAD, or version tag in attribution URLs.
|
||||||
|
3. Add factual House Format entries with supplied copyright statements,
|
||||||
|
applicable SPDX expressions, local standard-text links, required upstream
|
||||||
|
notice links, and exact-commit Source links. Preserve alternatives and
|
||||||
|
exceptions; determine scope from contents rather than filenames.
|
||||||
|
4. Include LGPLv3 and its GPLv3 companion for the kit grants, and MIT for the
|
||||||
|
catalogs where confirmed by the pinned sources. Reuse shared local standard
|
||||||
|
texts; leave root project LICENSE unchanged.
|
||||||
|
5. Inspect upstream dependency inventories for leads, but do not copy them
|
||||||
|
wholesale or treat them as substitutes for Notarius's own inclusion scope.
|
||||||
|
Hand remaining selected third-party components to Stage 5 through the stage
|
||||||
|
report, not editorial prose in attribution.
|
||||||
|
|
||||||
1. Extend the existing application-owned `LLMGenerationError` rather than
|
**Acceptance:** These four components have verified source/notice links and
|
||||||
creating a parallel provider-error hierarchy. Retain `StatusCode()` and
|
complete applicable local texts. No dependency changes, guessed notices, or
|
||||||
`errors.Is(err, ErrLLMGeneration)`. Add application-owned failure-kind,
|
new distribution obligations were invented.
|
||||||
exhaustion, and exhausted-generation attempt metadata/accessors; use uint64
|
|
||||||
for upstream attempt counts. Preserve the existing constructor's callers
|
|
||||||
with sensible unspecified/generation metadata, adding a metadata constructor
|
|
||||||
or private adapter helper as needed.
|
|
||||||
2. Define kinds for `transport`, `provider_status`, `malformed_response`, and
|
|
||||||
generic `generation`. Exhaustion is an independent boolean and attempt count,
|
|
||||||
not a replacement kind. Zero attempts means unavailable in this error
|
|
||||||
projection, not proof no request happened. The count comes from
|
|
||||||
`RetryExhaustedError.Attempts()` and covers the exhausted generation, not all
|
|
||||||
repair generations combined.
|
|
||||||
3. Use `errors.Is`/`errors.As` on upstream sentinels/types. Keep cancellation and
|
|
||||||
deadline identity first, capacity handling intact, and HTTP status available
|
|
||||||
through an exhaustion wrapper. Do not unwrap application errors to upstream
|
|
||||||
provider objects or classify by prose. Preserve sanitized diagnostic text.
|
|
||||||
4. A malformed provider envelope is a generation failure; schema-invalid model
|
|
||||||
content stays `ErrInvalidStructuredOutput`. Do not change outer retry or
|
|
||||||
validator disposition logic. Document classification at the integration and
|
|
||||||
internal LLM boundaries.
|
|
||||||
|
|
||||||
**Acceptance/tests:** Adapter tests cover transport, malformed response,
|
**Validation:** Check exact revision correspondence, upstream filenames, every
|
||||||
noneligible status, exhausted eligible status with count/status preserved, and
|
new local license link, and byte fidelity of standard texts. Run
|
||||||
cancellation/deadline/capacity regression behavior. Check typed fields and
|
`git diff --check`; confirm go.mod/go.sum are unchanged. Report discovery
|
||||||
identities, not full messages. Existing credential-redaction cases remain valid
|
commands and evidence; do not add a persistent inventory tool or audit artifact.
|
||||||
for nested exhaustion diagnostics; use fake secrets only.
|
|
||||||
|
|
||||||
**Validate:** `GOWORK=off go test ./internal/framework/contracts ./internal/framework/llm ./internal/framework/pipeline`
|
## Stage 5 — Complete Attribution And Connect Reader Navigation
|
||||||
and `git diff --check`.
|
|
||||||
|
|
||||||
## Stage 5 — Project Request-Local Execution Observations
|
**Goal:** Finish remaining incorporated-component coverage and canonical
|
||||||
|
navigation. One prompt for the remaining small dependency set and doc links.
|
||||||
|
|
||||||
**Status:** Completed 2026-09-25.
|
**Read:** Adopted OSS policy, remaining selected module/source notices,
|
||||||
|
README.md, integration guides, and repository evidence of copied code/assets.
|
||||||
|
Start with jsonschema/v6 v6.0.2, x/text v0.40.0, yaml.v3 v3.0.1, and yaml/v4
|
||||||
|
v4.0.0-rc.6, then resolve any additional actual incorporation revealed by
|
||||||
|
Stage 4. A go.sum entry alone is not proof of incorporation.
|
||||||
|
|
||||||
**Goal:** Return a lightweight terminal summary even when generation fails.
|
**Files:** Update `docs/oss/attribution.md`, applicable
|
||||||
One prompt focused on contracts and adapter mapping, without persistence changes.
|
`docs/oss/licenses/*`, `README.md`,
|
||||||
|
`docs/integrations/pkg-configkit.md`, and
|
||||||
|
`docs/integrations/pkg-promptkit.md`.
|
||||||
|
|
||||||
**Inspect:** `internal/framework/contracts/contracts.go`, `CompleteStructured`,
|
1. Inspect direct/transitive incorporation and copied material separately.
|
||||||
`responseFromResult`, prepared execution tests, upstream `observations.go` and
|
Apply the same exact-revision, factual-entry, and faithful-text rules as
|
||||||
prepared-execution observer documentation.
|
Stage 4. Include relevant components, not every tool used in development.
|
||||||
|
Do not add generic entries with unresolved versions or copyrights.
|
||||||
|
2. Use the OSS format for omitted copyright/SPDX fields where the source
|
||||||
|
supplies no applicable value. Preserve required project-specific notices.
|
||||||
|
Raise only a concrete unresolved obligation or rights issue; do not seek
|
||||||
|
blanket approval for the already selected linked-notice arrangement.
|
||||||
|
3. End README with the prescribed GPL-v3-or-later COPYRIGHT link and the
|
||||||
|
Open Source attribution notices link. Do not imply that every incorporated
|
||||||
|
component or document has the application's license.
|
||||||
|
4. Replace competing license/notice paragraphs in both integration guides with
|
||||||
|
concise links to the relevant canonical attribution anchors. Keep dependency
|
||||||
|
pins, behavior, compatibility, and public API links in the guides.
|
||||||
|
5. Keep the attribution document to its title and factual component entries.
|
||||||
|
Do not include the inventory research, legal conclusions, or completion logs.
|
||||||
|
Do not copy unused upstream examples or standard licenses.
|
||||||
|
|
||||||
**Work:**
|
**Acceptance:** Attribution covers the verified relevant components and copied
|
||||||
|
policy material, with only applicable texts. README and integration links point
|
||||||
|
to the canonical inventory; no user-visible API or dependency settings change.
|
||||||
|
|
||||||
1. Add an optional `Execution *LLMExecutionSummary` field to
|
**Validation:** Review coverage against resolved dependencies and inspected
|
||||||
`StructuredCompletionResponse` (`execution,omitempty`). Own these DTOs in
|
copied-material evidence, validate affected relative/source links and text
|
||||||
Notarius contracts; do not alias or serialize upstream event types.
|
fidelity, and run `git diff --check`. No Go suite, scanner, or SBOM is required
|
||||||
2. The summary contains uint64 `attempts`, `transient_retries`, `repair_calls`;
|
solely for documentation changes.
|
||||||
integer millisecond `capacity_wait_ms`, `generation_ms`, `retry_delay_ms`,
|
|
||||||
`duration_ms`; `outcome`, `failure_kind`, `status_code`, `retries_exhausted`;
|
|
||||||
and `usage`. Usage contains prompt/completion/total/cached/cache-write counts,
|
|
||||||
each with `value`, `known`, `complete` fields. Do not omit these booleans or
|
|
||||||
known-zero values. The summary needs no prompts, response text, endpoints,
|
|
||||||
credentials, raw errors, or new copies of run/profile identifiers.
|
|
||||||
3. Map terminal outcome/failure values explicitly to application-owned strings.
|
|
||||||
Preserve the distinctions exposed by v0.11.0 (including canceled, deadline,
|
|
||||||
capacity, invalid output, configuration/load/render failures); unknown future
|
|
||||||
failures map to `other`. Reuse relevant application failure vocabulary from
|
|
||||||
Stage 4, without forcing every execution error into a generation error.
|
|
||||||
4. Attach a local observer to the `RunRequest` before `PrepareExecution` freezes
|
|
||||||
it. Retain the `ExecutionFinished` projection only: upstream supplies aggregate
|
|
||||||
counts, durations, and usage. Do not sum attempt events and terminal totals,
|
|
||||||
retain an event log, or reconstruct a second accounting system. Synchronous
|
|
||||||
request-local collection needs no global state or asynchronous queue.
|
|
||||||
5. Attach that summary to every subsequent return from `RunPrepared`, including
|
|
||||||
context/capacity/provider failure and post-result decode/validation failure.
|
|
||||||
Preparation failure has no execution event and returns no summary. Preserve
|
|
||||||
upstream execution outcome as such: a later Notarius decode error remains a
|
|
||||||
separate returned error, not a fabricated upstream terminal event.
|
|
||||||
6. Keep existing successful-result token and repair fields unchanged. Observed
|
|
||||||
`repair_calls` represents execution activity and is not a renamed legacy
|
|
||||||
`RepairAttempts`. No observation field is a billable-cost guarantee.
|
|
||||||
|
|
||||||
**Acceptance/tests:** Success, failed execution, cancellation, and no-observation
|
## Stage 6 — Verify The Complete Adoption
|
||||||
preparation failure retain the right presence. Test known zero versus unknown
|
|
||||||
and partial aggregate usage with controlled provider responses. One concurrent
|
|
||||||
completion case proves no summary cross-contamination. Check relationships and
|
|
||||||
nonnegative durations, not exact timing. Document the DTO and mapping in
|
|
||||||
`docs/internal/llm.md`; public dependency semantics stay in pkg-promptkit.
|
|
||||||
|
|
||||||
**Validate:** `GOWORK=off go test ./internal/framework/contracts ./internal/framework/llm`
|
**Goal:** Perform the cross-document check and correct scoped documentation
|
||||||
and `GOWORK=off go test -race ./internal/framework/llm`.
|
defects. One prompt; no fresh feature work or automated policy-sync system.
|
||||||
|
|
||||||
## Stage 6 — Carry Summaries Through Existing Debug Paths
|
**Read:** The feature roadmap; the seven resulting policies and their pinned
|
||||||
|
sources; AGENTS.md, developer guide, COPYRIGHT, README, attribution/license
|
||||||
**Status:** Completed 2026-09-25.
|
materials, release runbook, and affected integration links.
|
||||||
|
|
||||||
**Goal:** Make observations useful to operators without a new output channel.
|
|
||||||
One prompt, limited to debug propagation and terminal allowlists.
|
|
||||||
|
|
||||||
**Inspect:** `internal/framework/pipeline/debug.go`, its response-content/fallback
|
|
||||||
helpers, terminal recording tests, and `debugLLMScope.references`. Trace
|
|
||||||
`debugLLMCallReference` through the existing timed stage/terminal envelopes;
|
|
||||||
updating only the detailed response file is insufficient. The CLI's separate
|
|
||||||
run-summary files do not need a new run-wide accounting mechanism.
|
|
||||||
|
|
||||||
**Work:**
|
|
||||||
|
|
||||||
1. Project the optional execution summary into existing debug response artifacts
|
|
||||||
and per-call references used by stage/terminal records. Explicitly preserve it
|
|
||||||
when `Debug.Response` or `RunResult` is absent and through content splitting
|
|
||||||
and fallback construction. Keep copies detached if existing clone paths
|
|
||||||
could otherwise share mutable pointers.
|
|
||||||
2. Use explicit typed fields as the allowlist for this metadata-only terminal
|
|
||||||
projection. Do not carry raw upstream events, newly copied provider diagnostics, or model
|
|
||||||
content into safe terminal summaries. Preserve established redaction and
|
|
||||||
detailed-trace content boundaries.
|
|
||||||
3. Leave warnings, normal console output, receipts, domain artifacts, checkpoint
|
|
||||||
payloads, and no-debug behavior unchanged. No new telemetry file or aggregation
|
|
||||||
of observed token totals into legacy totals.
|
|
||||||
4. Update `docs/internal/state.md`/relevant debug internals and `docs/operations.md`
|
|
||||||
to identify where this diagnostic information is available. Link to the
|
|
||||||
canonical explanation rather than repeating every field in consumer docs.
|
|
||||||
|
|
||||||
**Acceptance/tests:** Through the real debug wrapper and existing recorder seam,
|
|
||||||
verify success and failed/canceled completions retain summaries in response and
|
|
||||||
safe terminal records. Verify content splitting/fallback does not discard them,
|
|
||||||
and debug disabled writes nothing. Reuse existing redaction tests, adding only
|
|
||||||
the new projection assertions. No new warnings result from recovered retries.
|
|
||||||
|
|
||||||
**Validate:** `GOWORK=off go test ./internal/framework/pipeline ./internal/cli`,
|
|
||||||
`GOWORK=off go test -race ./internal/framework/pipeline`, `git diff --check`.
|
|
||||||
|
|
||||||
## Stage 7 — Verify Retry Composition And Finish Operator Guidance
|
|
||||||
|
|
||||||
**Status:** Completed 2026-09-25.
|
|
||||||
|
|
||||||
**Goal:** Validate the cross-boundary behavior that individual stages cannot
|
|
||||||
prove, then reconcile current documentation. One prompt; no generalized retry
|
|
||||||
test framework or runtime redesign.
|
|
||||||
|
|
||||||
**Inspect:** Existing adapter HTTP fixtures, scheduler cancellation tests,
|
|
||||||
pipeline stage retry/debug tests, CLI production tests; current config, LLM,
|
|
||||||
operations, and consumer documentation.
|
|
||||||
|
|
||||||
**Work and acceptance:**
|
**Work and acceptance:**
|
||||||
|
|
||||||
- Add one representative local-HTTP scenario combining a recoverable transient
|
1. Compare all seven policies directly against the selected revision. Classify
|
||||||
status with structurally invalid generated content followed by a successful
|
remaining differences as metadata, template removal, required customization,
|
||||||
repair. Prove transient budgets apply independently per generation and
|
or a feature-roadmap exception. Replace accidental paraphrases with upstream
|
||||||
terminal attempt/repair/usage accounting is not doubled. Use small explicit
|
wording. Preserve established local requirements.
|
||||||
budgets rather than executing the illustrative 18-request worst case.
|
2. Confirm versions 1.3/1.3/1.11/1.3/1.4/1.0/1.8 for agents, architecture,
|
||||||
- Exercise cancellation during provider-directed retry waiting without a long
|
documentation, testing, release, meta, and OSS respectively. Verify each
|
||||||
real sleep: signal that the request was received, cancel a context while a
|
Upstream Source targets its own file and Last Updated reflects actual work.
|
||||||
long Retry-After is pending, and wait with a bounded test timeout. Preserve
|
3. Confirm discovery links follow public project/main-guide URLs while adopted
|
||||||
cancellation identity and the terminal observation. Do not build a second
|
source, examples, and component attribution remain accurately commit-pinned.
|
||||||
backoff implementation or test exact random delays.
|
Check no placeholder UPSTREAM_COMMIT, template-only section, or local
|
||||||
- Review shared scheduler tests for completion-scoped permit ownership and
|
checkout-dependent reference remains in adopted materials.
|
||||||
cancellation/release. Add a focused integration case only where existing
|
4. Check selective policy routing, local authority, canonical documentation
|
||||||
coverage does not protect that boundary across the new retry path. Keep
|
ownership, copied-material scope/modification status, unchanged application
|
||||||
upstream backend capacity algorithms upstream.
|
grant/root LICENSE, and directly reachable license/companion texts.
|
||||||
- Confirm a recovered generation passes through ordinary success without
|
5. Verify source-only publication, selected gates, optional diagnostics,
|
||||||
producing process warnings. Preserve existing outer stage retries and semantic
|
release completion, and prospective-only footer guidance still agree.
|
||||||
feedback. Do not alter limits to hide budget multiplication.
|
Do not modify historical notes, accepted ADRs, or scripts to satisfy this check.
|
||||||
- Finish operations guidance: distinguish transient, structural, and stage/
|
6. Review changed-file scope: only intended policy, notice, and supporting
|
||||||
validator budgets; give the 18-attempt single-producer illustration with its
|
documentation files should have changed. Correct in-scope documentation
|
||||||
assumptions; explain per-attempt timeout versus overall caller cancellation,
|
defects, report unresolved concrete issues, and leave unrelated roadmap
|
||||||
Retry-After waits, cost/latency implications, incomplete usage accounting, and
|
retirement and release preparation to an explicit later request.
|
||||||
the outer scheduler holding its permit during waits. No new total deadline or
|
|
||||||
exactly-once guarantee is implied.
|
|
||||||
- Review all canonical docs changed earlier for consistency. Keep exact fields
|
|
||||||
and defaults in config, flags in CLI, dependency semantics in integrations,
|
|
||||||
mechanism in internals, and operating implications in operations. Keep the
|
|
||||||
migration note about overlays distinct from unchanged LLM profiles. Retain
|
|
||||||
historical ADR/release content; no new ADR is needed for these upgrades.
|
|
||||||
|
|
||||||
**Validate:** Run the focused adapter/pipeline/CLI tests and race tests covering
|
**Validation:** Run `git diff --check`; inspect file/link destinations and
|
||||||
modified concurrency paths. Review tests for unnecessary upstream duplication
|
compare local standard texts with verified sources. A search for
|
||||||
or exact-prose/change-detector assertions; consolidate rather than multiply them.
|
`Base Policy Template` or `UPSTREAM_COMMIT` in adopted files should be empty;
|
||||||
|
do not confuse explanatory roadmap text with an unfilled adopted template.
|
||||||
## Stage 8 — Final Integration Verification And Handoff
|
No production tests, new test framework, recurring synchronization gate, or
|
||||||
|
release execution is needed.
|
||||||
**Status:** Completed 2026-09-25.
|
|
||||||
|
|
||||||
**Goal:** Verify the complete upgraded application and documentation against the
|
|
||||||
feature roadmap. One final verification prompt; fix only defects within scope.
|
|
||||||
|
|
||||||
**Work:** Review all feature acceptance items and staged diffs. Confirm no
|
|
||||||
upstream types escaped the LLM boundary, no references to the retired config
|
|
||||||
flag remain in current examples/help, no unintended LLM profile rename occurred,
|
|
||||||
and no source-only/license/release scope expanded. Check edited relative links.
|
|
||||||
Leave the roadmap available for the user's completion review; do not publish a
|
|
||||||
release or delete planning documents automatically.
|
|
||||||
|
|
||||||
**Validation commands:**
|
|
||||||
|
|
||||||
```sh
|
|
||||||
GOWORK=off go test ./...
|
|
||||||
GOWORK=off go vet ./...
|
|
||||||
GOWORK=off go build ./...
|
|
||||||
GOWORK=off go mod tidy -diff
|
|
||||||
GOWORK=off go test -race ./internal/framework/llm ./internal/framework/pipeline
|
|
||||||
GOWORK=off go run ./cmd/notarius config validate --config examples/dnd-minimal.config.yml
|
|
||||||
GOWORK=off go run ./cmd/notarius config validate --config examples/dnd-complete.config.yml
|
|
||||||
GOWORK=off go run ./cmd/notarius config validate --config examples/dnd-complete.config.yml --config-overlay development
|
|
||||||
git diff --check
|
|
||||||
```
|
|
||||||
|
|
||||||
Reuse already-passed checks for the same unchanged candidate where appropriate.
|
|
||||||
The example/CLI tests own maintained examples; the commands above are a one-time
|
|
||||||
migration smoke check, not new permanent release gates. No live model calls or
|
|
||||||
real API keys are required. Report environment/dependency-access failures
|
|
||||||
separately from implementation failures; do not claim blocked checks passed.
|
|
||||||
|
|
||||||
**Completion criteria:** Both exact dependency pins are active; overlay migration,
|
|
||||||
retry setting, typed errors, observations, debug propagation, tests, examples,
|
|
||||||
and current documentation satisfy the feature roadmap. Report commits and
|
|
||||||
checks, plus any residual limitation. Future release preparation should explain
|
|
||||||
the breaking overlay cutover, retry default/opt-out, and upstream license change
|
|
||||||
in a minor-release note, but is not part of this implementation.
|
|
||||||
|
|
||||||
## Open Questions
|
## Open Questions
|
||||||
|
|
||||||
None. The feature roadmap supplies the policy choices needed for implementation.
|
None at the agreed baseline. Policy choices and exceptions are settled.
|
||||||
The DTO naming and stage boundaries above settle remaining implementation choices
|
A newly discovered concrete notice/source or rights issue should be reported
|
||||||
without adding new product restrictions or compatibility promises.
|
with evidence and viable treatments rather than resolved by inventing a broader
|
||||||
|
requirement. That contingency does not authorize reopening settled policies.
|
||||||
|
|||||||
@@ -221,19 +221,10 @@ copying an additional documentation tree. Do not copy unused license texts,
|
|||||||
example projects, or placeholder documents. Root Notarius `AGENTS.md` is based
|
example projects, or placeholder documents. Root Notarius `AGENTS.md` is based
|
||||||
on upstream `agents/AGENTS.md`, not upstream's own contributor instructions.
|
on upstream `agents/AGENTS.md`, not upstream's own contributor instructions.
|
||||||
|
|
||||||
## Recommended Work Sequence
|
## Implementation Ownership
|
||||||
|
|
||||||
1. Adopt the policy set and orientation changes together with copied-policy
|
[Implementation Plan](implementation.md) owns the ordered work stages and their
|
||||||
attribution, its local license text, and the COPYRIGHT scope statement.
|
validation. This document owns the target end state, scope, and policy choices.
|
||||||
Keep cross-links valid at this boundary.
|
|
||||||
2. Complete incorporated-component attribution and applicable license texts;
|
|
||||||
connect README, integration guidance, and prospective release navigation.
|
|
||||||
3. Compare the result directly with the selected upstream files, verify that
|
|
||||||
remaining variations have the stated local justification, and check notices,
|
|
||||||
metadata, and links.
|
|
||||||
|
|
||||||
These are coherent work boundaries, not authorization to execute them during
|
|
||||||
roadmap preparation. A later implementation plan may subdivide them.
|
|
||||||
|
|
||||||
## Scope Boundaries And Acceptance
|
## Scope Boundaries And Acceptance
|
||||||
|
|
||||||
|
|||||||
Reference in New Issue
Block a user