LLM Concurrency Audit

Date: 2026-05-12

Summary

This document audits the current Audita execution flow for module sequencing, chunk proposal execution, validator execution, and LLM concurrency control.

Current implementation already provides:

  • serial module execution over a mutable working transcript,
  • per-module chunk recomputation from the current working transcript,
  • concurrent per-section proposal execution,
  • scheduler wiring for both proposal-generation and LLM-backed validator calls,
  • deterministic proposal aggregation and deterministic per-module apply ordering,
  • subprocess-safe behavior and deterministic test hooks without requiring live LLM credentials.

At audit time, the main gaps versus the requested target architecture were:

  • there was no separate --proposal-llm-concurrency flag,
  • there was no separate --total-llm-concurrency flag,
  • global concurrency was represented by existing --llm-concurrency,
  • scheduler implementation was semaphore-based and did not explicitly guarantee FIFO ordering.

Implementation Status (2026-05-12 Update)

The targeted concurrency gaps identified in this audit have now been addressed:

  • explicit total/proposal/validation LLM concurrency controls are implemented in config/env/CLI,
  • legacy llm-concurrency settings are preserved as compatibility aliases to total concurrency,
  • proposal and validation schedulers are composed with a global total-cap scheduler,
  • scheduler default behavior is FIFO with context-aware queued cancellation and reliable permit release,
  • runner proposal worker fan-out is aligned with effective proposal concurrency,
  • intra-module execution now pipelines section validation so proposal and validation LLM work can overlap within a module while retaining deterministic module-level apply ordering.

Audit Findings (Questions 1-14)

The findings in this section reflect repository state at audit time (before the refactor). See the implementation-status section for current-state behavior.

  1. Does the current runner execute modules serially?
  • Yes. Runner.Run loops through input.ModuleSpecs sequentially and updates working per module.
  1. Are chunks within a module processed serially or concurrently?
  • Concurrently. collectSectionProposals starts one goroutine per section, bounded by maxWorkers.
  1. Are chunks recomputed per module from the current working transcript, or computed once before all modules?
  • Recomputed per module from current working transcript via chunkWorkingTranscript inside the module loop.
  1. Are proposal-generation LLM calls routed through the existing scheduler consistently?
  • Yes for production module paths. Each module Propose calls proposal_generation.GenerateCandidates, which wraps LLM calls in req.Scheduler.Run(...) when a scheduler is present.
  1. Are LLM-backed validator calls routed through the existing scheduler consistently?
  • Yes. LLMBackedValidator.Validate wraps each batch call in req.Scheduler.Run(...) when provided.
  1. Are proposal-generation and validation LLM calls using the same scheduler, separate schedulers, or no scheduler?
  • By default, same global scheduler instance.
  • If validation concurrency is explicitly lower than primary, validation uses a composed scheduler (global AND validation-subcap).
  • Proposal uses global scheduler only.
  1. Is there currently a single global LLM concurrency limit?
  • Yes. --llm-concurrency (primary concurrency) drives the global scheduler capacity.
  1. Is there currently a proposal-specific concurrency limit?
  • No dedicated config/flag. Proposal concurrency is bounded by:
    • global scheduler permits (--llm-concurrency), and
    • runner worker fan-out (maxWorkers, currently tied to PrimaryLLM.Concurrency).
  1. Is there currently a validation-specific concurrency limit?
  • Yes, optional. --validation-llm-concurrency can create an additional validation sub-cap (composed with global). If unset, validation inherits primary/global.
  1. Is the existing scheduler FIFO, semaphore-only, or otherwise unspecified?
  • Semaphore-only (chan struct{} permit pool). FIFO queueing is not explicitly implemented/guaranteed.
  1. Are proposals applied per chunk as chunks complete, or collected and applied once per module?
  • Collected across all sections first, validated through the modules validator chain, then applied once per module.
  1. Are proposal indexes assigned deterministically by module/chunk/segment order, or can completion order affect indexes?
  • Deterministic. Section results are stored by section position and flattened in section order; completion order does not drive index assignment.
  1. Are report entries deterministic if chunks or validators complete out of order?
  • For chunk proposal execution: yes, deterministic output ordering is preserved.
  • Validator decisions are recorded in validator-return order; current validator implementations are deterministic for the same inputs, and LLM-backed validator decisions are sorted by proposal index before return.
  • Module-level reporting remains deterministic under normal deterministic/fake-client test conditions.
  1. Does the current implementation already have test hooks suitable for deterministic concurrency tests?
  • Yes.
    • CLI test hooks: injectable LLM clients/schedulers and subprocess test hooks (AUDITA_SUBPROCESS_TEST_LLM_MODE, timeout hook).
    • Runner tests already verify concurrent section proposals, deterministic index/order under out-of-order completion, and scheduler invocation behavior.
    • LLM validator and proposal-generation packages include scheduler-focused tests.

Current Flow (Concise)

  1. CLI validates inputs, normalizes transcript, and writes diagnostics artifacts.
  2. Runner starts with normalized transcript and executes modules sequentially.
  3. For each module:
  • chunk current working transcript,
  • run section proposals concurrently (bounded),
  • aggregate proposals deterministically,
  • execute validator chain,
  • apply approved proposals once,
  • emit deterministic module result data.
  1. Process report and diagnostics are written; subprocess contracts remain stable.

Gaps vs Desired Target Architecture (Audit-Time Snapshot)

Matches target:

  • Modules are serial.
  • Each module sees previous modules output transcript.
  • Chunks can run concurrently for proposal generation.
  • Proposal and validator LLM calls both use scheduler paths.
  • Approved proposals are collected then applied once per module.
  • Completion order does not affect final proposal index ordering.
  • go test ./... does not require real LLM credentials.
  • Subprocess-oriented behavior remains intact.

Gaps at audit time:

  • missing dedicated --proposal-llm-concurrency surface,
  • missing dedicated --total-llm-concurrency surface (at the time this role was played by --llm-concurrency),
  • scheduler did not provide explicit FIFO semantics,
  • validation remained internally batched and sequential within one validator invocation.

Minimum Implementation Plan (Completed)

  1. Config/CLI surface
  • Add explicit total llm concurrency setting and CLI/env wiring.
  • Add explicit proposal llm concurrency setting and CLI/env wiring.
  • Keep existing validation concurrency as the validator sub-cap.
  • Validate: proposal <= total, validation <= total.
  1. Scheduler construction in CLI runtime
  • Build one global scheduler from total concurrency.
  • Build proposal scheduler as composed limiter: global AND proposal-subcap when proposal sub-cap is lower than total; otherwise global.
  • Keep validation scheduler composition pattern: global AND validation-subcap when explicit lower cap exists.
  1. Runner proposal worker limit alignment
  • Decouple section worker fan-out from PrimaryLLM.Concurrency and align with effective proposal concurrency cap to avoid worker oversubscription beyond intended proposal limit.
  1. FIFO scheduling policy support
  • Introduce scheduler policy abstraction (default FIFO) in internal/framework/llm while preserving contracts.LLMScheduler interface shape used by runner/modules/validators.
  • Keep current behavior-compatible defaults where policy config is not yet exposed.
  1. Tests
  • Add config/CLI tests for new concurrency constraints and inheritance behavior.
  • Add runner/LLM tests proving:
    • total cap across proposal + validation combined,
    • proposal sub-cap enforcement,
    • validation sub-cap enforcement,
    • deterministic outputs unchanged under out-of-order completion.

Notes

  • This document is retained as an audit record; see the implementation-status section for current behavior.
  • No prompt/module/validator/report schema changes were required to close the identified concurrency gaps.