**Last updated:** 2026-09-24
|
||||
|
||||
**Status:** Final target selected; production implementation pending. The boundary
|
||||
and selected overlays are verified. The [implementation plan](implementation.md)
|
||||
owns execution stages; no production migration or release has begun.
|
||||
**Status:** Production implementation complete. The selected configuration and
|
||||
overlay model is implemented; [implementation evidence](implementation.md)
|
||||
records verification. No release has been published.
|
||||
|
||||
## Purpose and Direction
|
||||
|
||||
@@ -20,15 +20,14 @@ guide instead of legacy loaders, aliases, dual operating modes, or an ongoing
|
||||
compatibility layer. Retain existing syntax only when it independently suits the
|
||||
new model, not because compatibility requires it.
|
||||
|
||||
The initial review and prototype used ConfigKit v0.3.1. The prototype now pins
|
||||
v0.4.0 and verifies its selected-overlay path; original v0.3.1 findings remain
|
||||
historical. The installed
|
||||
application must depend on a versioned module, not a sibling checkout or local
|
||||
module replacement.
|
||||
The initial review and prototype used ConfigKit v0.3.1, then verified v0.4.0
|
||||
selected overlays. Those findings remain historical; the prototype was removed
|
||||
after production integration. The application depends on a versioned module,
|
||||
without a sibling checkout or local module replacement.
|
||||
|
||||
The shared boundary/prototype unit is complete. Its [selected contract, inventory,
|
||||
and evidence](library-boundary-findings.md) define the detailed target alongside
|
||||
this roadmap. Production configuration migration has not begun.
|
||||
this roadmap. Production configuration migration is complete.
|
||||
|
||||