Connect release notes and complete policy alignment
This commit is contained in:
@@ -3,7 +3,7 @@
|
||||
**Last updated:** 2026-09-25
|
||||
|
||||
**Status:** Implemented. This document owns the target behavior and user intent.
|
||||
[implementation.md](implementation.md) owns concrete decisions, ordered work,
|
||||
[historical implementation plan](https://gitea.maximumdirect.net/eric/audita/src/commit/91d9be68a7bb3a102900253fdfd8438f0a43f666/docs/roadmap/implementation.md) owns concrete decisions, ordered work,
|
||||
and verification.
|
||||
|
||||
## Purpose and User Intent
|
||||
@@ -119,7 +119,7 @@ Debug evidence distinguishes unavailable validation from editorial rejection.
|
||||
|
||||
The schema/transport boundary remains with PromptKit; reconciliation needs no
|
||||
additional model call. Concrete helper structures, reason names, mapping changes,
|
||||
and verification steps belong in the [implementation plan](implementation.md).
|
||||
and verification steps belong in the [historical implementation plan](https://gitea.maximumdirect.net/eric/audita/src/commit/91d9be68a7bb3a102900253fdfd8438f0a43f666/docs/roadmap/implementation.md).
|
||||
|
||||
## Scope Boundaries
|
||||
|
||||
|
||||
@@ -2,7 +2,7 @@
|
||||
|
||||
**Last updated:** 2026-09-28
|
||||
|
||||
**Status:** In progress; Stages 1–3 complete.
|
||||
**Status:** Complete; Stages 1–4 implemented.
|
||||
**Audience:** gpt-5.6-terra coding agent.
|
||||
**Audita planning baseline:** `91d9be68a7bb3a102900253fdfd8438f0a43f666`.
|
||||
**Selected upstream revision:** `d84a38ebab26f048cafbe59a2246700c35d29843`.
|
||||
@@ -232,6 +232,14 @@ inventory generator, or test suite is required.
|
||||
|
||||
## Stage 4 — Integrate Release Notes and Finish Cross-Document Validation
|
||||
|
||||
**Completed:** 2026-09-28. Wired the checked-in release note into the hosted
|
||||
release plugin, documented immutable-tag notice links and release preparation,
|
||||
repaired the specified historical roadmap references, and marked the feature
|
||||
roadmap implemented. Parsed the YAML, substituted `v2.0.0` to a tracked note,
|
||||
checked non-overwrite settings and candidate footer paths, reviewed all seven
|
||||
policies against the pinned source, and checked repository-local Markdown links
|
||||
and `git diff --check`. Hosted execution awaits the next real release.
|
||||
|
||||
**Files:** `.woodpecker/release.yml`, `docs/release.md`, affected documentation
|
||||
links, `docs/roadmap/policy.md`, and this plan. Repair the historical references
|
||||
specified below; do not retire unrelated roadmaps in this sprint.
|
||||
|
||||
@@ -4,8 +4,7 @@
|
||||
|
||||
**Status:** Production implementation complete. ConfigKit v0.4.1 and PromptKit
|
||||
v0.11.1 are adopted; [historical implementation evidence](https://gitea.maximumdirect.net/eric/audita/src/commit/cb405f6/docs/roadmap/implementation.md) records the
|
||||
completed checks. The current `implementation.md` covers span deletion instead.
|
||||
Release compliance and publication remain separate work.
|
||||
completed checks. Release compliance and publication remain separate work.
|
||||
|
||||
## Goal and Ownership
|
||||
|
||||
|
||||
@@ -2,10 +2,10 @@
|
||||
|
||||
**Last updated:** 2026-09-28
|
||||
|
||||
**Status:** Accepted direction; implementation pending. This roadmap replaces
|
||||
its earlier licensing-only scope and defines the desired end state, not a staged
|
||||
implementation plan. [implementation.md](implementation.md) owns the ordered
|
||||
work and verification. This roadmap does not itself adopt the policies below.
|
||||
**Status:** Implemented. This roadmap replaces its earlier licensing-only scope
|
||||
and records the accepted end state. [implementation.md](implementation.md)
|
||||
records the ordered work and verification; the adopted policies are in
|
||||
`docs/policy/`.
|
||||
|
||||
## Purpose and Review Revision
|
||||
|
||||
|
||||
Reference in New Issue
Block a user