Connect processing to shared PromptKit backend capacity
This commit is contained in:
@@ -382,7 +382,20 @@ full runner behavior is Stage 8.
|
||||
|
||||
## Stage 8: Connect the Runner and Remove the Old Scheduling Hierarchy
|
||||
|
||||
**Status:** Pending. **Depends on:** Stages 2 and 4–7.
|
||||
**Status:** Complete (2026-09-24). CLI processing now supplies both role clients
|
||||
from one PromptKit engine; removed global/role schedulers, scheduler contracts,
|
||||
the old utilization instrumentation, and retired concurrency settings. Runner
|
||||
ordering, cancellation, partial failure handling, and domain checks remain.
|
||||
Updated architecture and runtime guidance. `go build -o /tmp/audita-stage8-build
|
||||
./cmd/audita` passed; focused diagnostics, module, proposal, validator, runner,
|
||||
and LLM suites passed; `go test -race ./internal/framework/llm` passed. Local
|
||||
HTTP tests covered shared backend capacity, independent backend identities,
|
||||
zero-wait rejection, queued deadline cancellation, and later capacity reuse.
|
||||
A real CLI-to-local-HTTP run completed with one proposal and two validation
|
||||
calls and wrote the corrected transcript. The legacy CLI test file still uses
|
||||
retired configuration and report contracts; assembled CLI tests remain for
|
||||
Stages 10–12. `git diff --check` passed.
|
||||
**Depends on:** Stages 2 and 4–7.
|
||||
**Owns:** CLI process assembly, `internal/framework/runner`, old scheduler contracts,
|
||||
and runner/CLI integration tests.
|
||||
|
||||
|
||||