Finalize the ConfigKit and PromptKit implementation plan

This commit is contained in:
2026-09-24 01:23:32 +00:00
parent 116648fa78
commit 1ad2119283
5 changed files with 642 additions and 659 deletions

View File

@@ -11,9 +11,9 @@ is isolated from production. No publication or upstream changes were made.
## Next Unit: Testing Overlays and Production Migration Plan
**Status:** Complete. The [ordered production handoff](configkit.md#ordered-production-migration-handoff)
is ready for subsequent work; [implementation.md](implementation.md) records this
unit's checks. The original work packages below remain
**Status:** Complete. The [production implementation plan](implementation.md)
owns subsequent work; the [overlay findings](library-boundary-findings.md#selected-overlay-extension-2026-09-24)
record this unit's checks. The original work packages below remain
historical scope for the completed first unit.
Extend the existing prototype to prove the [selected-overlay contract](configkit.md#selected-overlays-for-testing)
@@ -68,7 +68,7 @@ their existing names and meaning.
Define and prove the boundary between Audita, ConfigKit, and PromptKit before
replacing Audita's production configuration or LLM runtime. This unit covers the
shared design and representative prototype in stages 1 and 2 of the
shared design and representative prototype supporting the
[coordinated adoption roadmap](library-adoption.md). The
[ConfigKit roadmap](configkit.md) continues to own the broader configuration scope.