Simplify the library migration to target the final integration

This commit is contained in:
2026-09-24 01:09:43 +00:00
parent 5b7d2e6e81
commit 116648fa78
5 changed files with 75 additions and 137 deletions

View File

@@ -36,7 +36,7 @@ Required work:
alone is insufficient evidence.
- Record new results separately from the historical v0.3.1 findings. Expand the
existing ConfigKit roadmap into a concrete production implementation handoff,
including the interim runtime boundary and removal of legacy configuration.
including final runtime integration and removal of legacy configuration.
Target end state: reviewers can run the prototype with and without the testing
selection and see both LLM roles switch models. The offline test suite establishes
@@ -254,8 +254,8 @@ This unit is complete only when:
code is clearly isolated and has a removal/integration destination during the
production migrations; no second supported runtime is introduced.
- A component-level follow-up identifies code to replace, domain code to retain,
tests to update, documentation/migration-guide work, and any temporary bridge
needed while ConfigKit lands ahead of PromptKit.
tests to update, documentation/migration-guide work, and direct integration of
the final configuration and PromptKit runtime.
- Licensing/distribution follow-up for the selected dependency graph is identified
for the later release stage; this prototype does not claim release compliance.
- Roadmap links and examples resolve, appropriate checks pass, and commits contain