Record coordinated suite upgrade validation
This commit is contained in:
@@ -352,6 +352,8 @@ commit local unless separately asked to push; it is not a downstream dependency.
|
||||
|
||||
## Stage 6: Record Evidence and Hand Off for Independent Review
|
||||
|
||||
Completion: complete (2026-09-29).
|
||||
|
||||
### Required Policy Review
|
||||
|
||||
Read `AGENTS.md`, `docs/orientation.md`, `docs/conventions.md`,
|
||||
@@ -389,7 +391,7 @@ mark F0022 done, begin another feature, or push unrelated workspace history.
|
||||
|
||||
## Progress Notes
|
||||
|
||||
Plan approved. Stage 1 publication is blocked. On 2026-09-29, all four exact
|
||||
Plan approved. Stage 1 publication was initially blocked. On 2026-09-29, all four exact
|
||||
reviewed revisions were present locally; clean worktrees and expected Gitea
|
||||
origins were confirmed. After fetching, each `origin/main` was three reviewed
|
||||
feature commits behind the selected revision and could fast-forward. The first
|
||||
@@ -402,6 +404,25 @@ had started.
|
||||
`3c0700b` revisions to their existing Gitea `origin/main` branches succeeded.
|
||||
A fresh fetch and ancestor check verified all four public references. No
|
||||
standalone code or dependency pin changed in this stage.
|
||||
- Stage 2: pipeline migration and existing integration cases passed `bash -n`,
|
||||
the full role harness, and `git diff --check`; role commit `8ea8621`.
|
||||
- Stage 3: representative override, nullable omission, native effective views,
|
||||
and clean repeats passed the full role harness; public assembly revision
|
||||
`ea8b09e190419586ede6df3815d1ea999a0f4391`. A subsequent fixture-JSON
|
||||
line formatting change passed shell syntax, JSON parsing, and whitespace
|
||||
checks without another full harness run.
|
||||
- Stage 4: the exact public pipeline revision was subtree-imported. The
|
||||
collection artifact harness passed with public dependencies, native base and
|
||||
testing validation, and a clean repeat; public collection revision
|
||||
`3d77eb382bcb4c1742015d3c32e23630bb8c73bf`.
|
||||
- Stage 5: public consumer dependencies installed into disposable paths;
|
||||
real-inventory `--list-hosts` selected `pipeline-dnd`, and `--syntax-check`
|
||||
and `git diff --check` passed without Vault decryption or deployment. Consumer
|
||||
revision `f694dad9426ee21138b175e44a3855d42be99d4b` remains local.
|
||||
- Stage 6: cross-repository pins and owning repository worktrees were checked;
|
||||
implementation is complete, independent review pending. Operational
|
||||
deployment, live processing, session migration, and tagged release remain
|
||||
deferred.
|
||||
|
||||
## Open Questions
|
||||
|
||||
|
||||
Reference in New Issue
Block a user