Prepare post-decode CLI inspection context
This commit is contained in:
@@ -1,6 +1,6 @@
|
||||
# Sequence Identity And Combination Implementation Plan
|
||||
|
||||
Status: implementation in progress; Stages 1–24 complete.
|
||||
Status: implementation in progress; Stages 1–25 complete.
|
||||
|
||||
Audience: a Luna coding agent implementing one numbered stage per prompt, in
|
||||
order. This plan starts at commit
|
||||
@@ -843,6 +843,12 @@ retain the existing public CLI lifecycle until Stage 26.
|
||||
Validation: history/metadata/resolution/secret tests and the everyday check.
|
||||
Public activation must not require a later stage to repair these mechanisms.
|
||||
|
||||
**Completion:** Prepared detached post-decode inspection, resolution metadata,
|
||||
and effective secret-reference/location handoffs using existing history
|
||||
machinery. Verified the private target pipeline and unchanged public-load
|
||||
regressions with focused history/metadata/resolution/secret tests and
|
||||
`./scripts/check.sh`.
|
||||
|
||||
## Stage 26 — Activate CLI After Decoding In The Shared Lifecycle
|
||||
|
||||
Scope: activate ADR 0018 through both loading paths using Stages 23–25's complete
|
||||
|
||||
Reference in New Issue
Block a user