# Consolidation Implementation Plan
|
||||
|
||||
Status: in progress. Stages 1 through 4 are complete; follow Stage 5 through Stage 20 in order.
|
||||
Status: in progress. Stages 1 through 5 are complete; follow Stage 6 through Stage 20 in order.
|
||||
The target executor is a Luna coding agent working through one end-to-end sprint.
|
||||
|
||||
## Authority, Baseline, And Execution
|
||||
@@ -270,7 +270,7 @@ test command currently cannot compile because the old assembly callers in
|
||||
`load_input.go` and `load_request.go` are scheduled to migrate in Stage 6; test
|
||||
verification is deferred until that integration.
|
||||
|
||||
## Stage 5 — Consolidate Import Requests And Default Ownership
|
||||
## Stage 5 — Consolidate Import Requests And Default Ownership (Complete)
|
||||
|
||||
**Owners:** engine import entry points, `importTraversal`, `source_version.go`,
|
||||
and tests that directly invoke the old import variants.
|
||||
@@ -301,6 +301,13 @@ and tests that directly invoke the old import variants.
|
||||
longer travel through version processing; no forwarding ladder remains merely
|
||||
to supply another nil/default positional parameter.
|
||||
|
||||
Progress notes (2026-10-25): replaced the import entry ladders with named
|
||||
requests and one access worker, moved defaults to acquisition policy, and
|
||||
retargeted direct import tests. The focused engine test command cannot compile
|
||||
yet because the remaining ordinary and grouped assembly callers are scheduled
|
||||
for Stage 6; verification is deferred until that integration. `git diff --check`
|
||||
passed.
|
||||
|
||||
## Stage 6 — Wire Ordinary And Grouped Lifecycle To Acquisition
|
||||
|
||||
**Owners:** engine `load.go`, `load_request.go`, `load_input.go`, related tests.
|
||||
|
||||