Clarify completed implementation records and later corrections
This commit is contained in:
@@ -1,10 +1,29 @@
|
||||
# Initial CommandKit implementation plan
|
||||
|
||||
Status: implementation complete; Stages 1-14 complete.
|
||||
Status: completed execution record; Stages 1-14 complete.
|
||||
|
||||
Date: 2026-10-07.
|
||||
|
||||
## Purpose and instructions for the implementation agent
|
||||
## Record scope and current owners
|
||||
|
||||
The staged instructions and API illustrations below are retained as the record
|
||||
of the completed initial implementation. They describe the assignments used to
|
||||
produce the [selected feature target](initial.md), not work to restart. The
|
||||
[CLI reference](../cli.md) owns current operator behavior, Go declarations and
|
||||
GoDoc own current API contracts, the [consumer guide](../consumers/guide.md) owns
|
||||
usage guidance, and the [internal overview](../internal/overview.md) owns mechanics.
|
||||
|
||||
### Subsequent code remediation
|
||||
|
||||
After original stage completion at `85f44cd`, ten code-remediation units were
|
||||
committed from `d8db15f` through `cb0b8dd`. They corrected scope-specific required
|
||||
selectors, inline YAML framing, cancellation boundaries, help failure delivery,
|
||||
validation delivery errors, outcome defaults, nil diagnostic handling, scope
|
||||
choices, selector-name collisions, and metadata-only help discovery. These
|
||||
corrections are reflected in current code and its regression checks. Original
|
||||
stage completion notes remain historical evidence, not a new validation run.
|
||||
|
||||
## Historical instructions for the implementation agent
|
||||
|
||||
Implement the selected end state in [the feature roadmap](initial.md). Read this
|
||||
whole plan before starting. Complete Stage 1, then each subsequent stage in numeric
|
||||
@@ -778,8 +797,10 @@ func RegisterPromptKit[C any](app *App, suite PromptKitSuite[C]) error
|
||||
bookkeeping. Configuration scope installation remains independent.
|
||||
3. Accept ID as one required operand. Prompt alone has singleton `--version`
|
||||
(default empty). Both accept standard Config/Overlay selection, context-selector
|
||||
bindings, and `--format text|yaml` (text default), plus help. No `--scope` is
|
||||
installed for definition commands. Selector target is `promptkit`; empty Scopes
|
||||
bindings, and `--format text|yaml` (text default), plus help. No built-in configuration-scope selector is
|
||||
installed for definition commands; a custom context selector can use the name
|
||||
`scope` when it does not collide with an installed flag. Selector target is
|
||||
`promptkit`; empty Scopes
|
||||
or a list containing promptkit applies, independent of a config scope registry.
|
||||
Other explicit targets are miswired metadata at registration.
|
||||
4. Reuse Stage 7's input/context creation and input-check rules. Missing ID is
|
||||
|
||||
@@ -1,6 +1,6 @@
|
||||
# Initial CommandKit feature roadmap
|
||||
|
||||
Status: selected initial implementation target; implemented.
|
||||
Status: selected initial target implemented; completed design baseline.
|
||||
|
||||
Date: 2026-10-07.
|
||||
|
||||
@@ -9,8 +9,10 @@ Date: 2026-10-07.
|
||||
This document defines the selected initial target for the library: packages,
|
||||
features, integration contracts, dependencies, and completion evidence. It was
|
||||
prepared using [the agreed checklist](initial-plan.md). Implementation steps and
|
||||
stage evidence belong in [the implementation plan](implementation.md). The
|
||||
included target is implemented; the table below records feature status.
|
||||
stage evidence belong in [the completed implementation plan](implementation.md).
|
||||
Detailed specifications below preserve the selected design baseline; they are
|
||||
planning history, not a parallel current API or operator reference. The included
|
||||
target is implemented; the table below records feature status.
|
||||
|
||||
| Included feature IDs | Status | Evidence |
|
||||
| --- | --- | --- |
|
||||
@@ -25,8 +27,10 @@ The [architecture policy](../policy/architecture.md) and nine accepted ADRs cont
|
||||
this roadmap. The delivery scope, typed API model, selector/report behavior, and
|
||||
full profile inspection described here were selected during roadmap review.
|
||||
These implementation choices operate within the accepted architecture. Exact
|
||||
exported contracts will belong in Go declarations and GoDoc; implemented operator
|
||||
contracts will belong in `docs/cli.md`.
|
||||
exported contracts belong in Go declarations and GoDoc, navigated through the
|
||||
[consumer guide](../consumers/guide.md); implemented operator contracts belong in
|
||||
the [CLI reference](../cli.md). The [internal overview](../internal/overview.md)
|
||||
owns current package inventory and mechanics.
|
||||
|
||||
### Requirements and traceability
|
||||
|
||||
|
||||
@@ -134,18 +134,20 @@ Owner: [initial-plan.md](initial-plan.md).
|
||||
|
||||
Owners: [initial.md](initial.md) and [implementation.md](implementation.md).
|
||||
|
||||
- [ ] Replace ownership statements written in future tense in the feature roadmap with
|
||||
- [x] Replace ownership statements written in future tense in the feature roadmap with
|
||||
links to the existing GoDoc and CLI reference. Clearly identify detailed
|
||||
specifications as the completed design baseline.
|
||||
- [ ] Label the implementation plan as a completed execution record and explain
|
||||
- [x] Label the implementation plan as a completed execution record and explain
|
||||
that subsequent fixes were committed after its original completion.
|
||||
- [ ] Reconcile the statement that definition commands have no `--scope` flag:
|
||||
- [x] Reconcile the statement that definition commands have no `--scope` flag:
|
||||
they have no built-in configuration-scope selection, but application-declared
|
||||
context selectors may use that name when it does not collide.
|
||||
- [ ] Preserve the explicitly labeled “At planning time” baseline as historical
|
||||
- [x] Preserve the explicitly labeled “At planning time” baseline as historical
|
||||
context. Keep diff/catalog and other genuine deferrals visible; completed
|
||||
design records must not become competing current API/CLI references.
|
||||
|
||||
**Completion:** Labeled feature specifications and staged instructions as completed history, linked current owners, and recorded later code fixes and selector-name behavior.
|
||||
|
||||
## D-07: correct the current CLI reference
|
||||
|
||||
Owner: [cli.md](../cli.md).
|
||||
|
||||